April 27, 2009
In process of finalizing code for nSite Central, and began writing the user manual.
April 17, 2009
Successfully tested a query which gathered data from multiple remote sites, added MD5 hashing of username-password concatenation to remote site connection protocol.
April 10, 2009
Added Javascript to the Updates section of the website, and added PDF versions of almost every document as well.
April 3, 2009
After widespread public outcry and worldwide riots in protest, Team DunKyan has decided to continue working on this project. Successfully sent a DataSet object across the network, meaning the networking problem is essentially solved. Focus is now shifting to report formatting.
April 1, 2009
Team DunKyan has decided to cancel this project.
March 30, 2009
Reporting App update: decided to use socket programming to solve the remote database connection issue.
March 17, 2009
Happy St. Patrick's Day! Finished the I.S. Management Application, so focus is now shifted to wrapping up the Reporting Application, specifically remote site access and report formatting.
March 16, 2009
Back from Spring Break and ready to finish off the semester strong!
March 3, 2009
Completely refactored all the code for the I.S. Management App, and we're currently in the process of completing the User Manager in totality. We split the profile management into a new manager called the Profile Manager, which we have already begun coding and will finish after completion of the User Manager.
February 24, 2009
The I.S. Management Application is beginning to take shape, with 'add user' and 'delete user' functionality being fully implemented. Work on the Reporting App continues as well.
February 20, 2009
Worklog updated.
February 17, 2009
Met with Jim Garrett on Monday, February 16, and discussed various aspects of the project with him. One of the main changes to be made is the elimination of the results table from the main GUI, as it will now appear on a separate page when a query is executed, thereby leaving the entire screen open for arranging the different query formation options.
February 10, 2009
Much progress on the Reporting Application has been made. Basic SQL queries are now supported, the 'sites to search' box lists all sites in the security database, and many of the design issues regarding the look-and-feel of the Reporting App have been resolved. A screenshot of the most current version of the Reporting App has been posted as well.
February 4, 2009
Successfully obtained a copy of EagleSoft via FTP. Still working on installing it, though.
February 2, 2009
Project Design presentation from last December posted. Worklog updated. All sample code is now encrypted.
January 28, 2009
Website updated to a three-column design to make more efficient use of space.
January 26, 2009
Worklog updated. Progress made with login page, as database authentication has finally been implemented. All our most recent code will be uploaded by Wednesday.
January 19, 2009
First version of worklog uploaded (under Additional Documents), as well as a sample ASP.NET login page.
January 18, 2009
Visual Studio files for GUI screenshots uploaded. Each team member checked out a laptop from the SIUC CS department for the semester on which to work on coding nSite Central. The team worklog will be uploaded by the end of the week and updated as much as possible throughout the next 16 weeks.
December 9, 2008
Initial screenshots of nSite Central uploaded, as well as second version of Project Plan. Initial version of Project Design uploaded.
December 8, 2008
First version of UML diagrams uploaded. Second version of class hierarchy chart uploaded.
December 7, 2008
Initial draft of contract between Team DunKyan and Patterson Dental to develop nSite Central has been uploaded. First version of class hierarchy diagram uploaded.
December 3, 2008
Version 3 of the Gantt chart uploaded. Documentation section of the website redone to provide for better organization.
November 17, 2008
Functional specification powerpoint and Project Plan powerpoint uploaded to Documentation section. Second version of Functional Specification will be uploaded later today, as scheduling conflicts prevented its completion on Friday.
November 12, 2008
Project plan and second version of Gantt chart uploaded. Second version of Functional Specification postponed until Friday.
November 7, 2008
Initial draft of Gantt chart created.
November 6, 2008
Many updates to report:
- the opacity setting for this website was not working correctly in IE, but that has been fixed
- the size of the logo was also not functioning properly in IE, and that has been fixed as well
- the second version of the Functional Specification will be finished at the latest by next Tuesday
- development of the Project Plan is underway
October 30, 2008
Website redesigned using CSS. Initial document will be uploaded later today.
October 21, 2008
Initial website launched. Updates coming soon.